Nashik district, located in the northwestern part of Maharashtra, is a key administrative hub within the Nashik Division of the state. For parliamentary representation, the district is covered by two main Lok Sabha constituencies: Nashik and Dindori. After a…

District

Nashik has 2 stalled projects, 2 awaiting budgets.

⚠️ 2 Stalled
6
Total Commitments
0 Fulfilled
0 In Progress
0%
Avg. Fulfillment
3
3 politician
0
Fulfilled
5
Allocations
₹26078.11 Cr
2
Stalled Projects
Funding Overview
Money Flow Explained:
Sanctioned: Total budget allocated
Earmarked: Funds linked to commitments/projects
Released: Funds disbursed by government
Spent: Funds actually utilized
Sanctioned₹26078.11 Cr
100% (Total Budget)
Earmarked₹26078.11 Cr (100.0%)
₹26078.11 Cr of ₹26078.11 Cr linked to commitments
Released₹0 (0.0%)
₹0 disbursed by government
Spent₹0 (0.0%)
₹0 actually utilized(0.0% of earmarked funds)
Unassigned Funds
₹0
0.0% of sanctioned
Utilization Rate
0.0%
of earmarked funds
Utilization Status
Low utilization: Only 0.0% of earmarked funds have been spent.
Data Gaps & Transparency Insights
Commitments Without Allocation
2 commitment(s) not linked to any funding allocation
Unlinked

What Citizens Are Watching in Nashik

New on C360

Projects recently added to Constituency360 platform

View All Projects
Nashik Road–Dwarka Flyover / Elevated Corridor (8 km, Bharatmala Proposal)
Infrastructure Project
planning

Project Overview

The Nashik Road–Dwarka elevated corridor is a proposed 8 km infrastructure project intended to ease congestion along one of Nashik’s busiest traffic stretches. As per public statements by Union Minister Nitin Gadkari in 2021 and 2022, the corridor is included within the Bharatmala Pariyojana framework. The early concept also referenced a possible double-decker structure, with vehicular movement on one level and a potential Metro Neo alignment on the upper level. The project is currently awaiting detailed planning, DPR preparation, and execution-related approvals from the Ministry of Road Transport & Highways (MoRTH).

Upcoming Milestone

June 2025 - Mahametro Grants NOC

Nashik Lok Sabha Constituency
🏢Ministry of Road Transport & Highways

Recent Updates

June 2025 - Mahametro Grants NOC
planned
18 Jun 2025
2023–24 - MP Rajabhau Waje Follows Up with MoRTH
planned
6 Dec 2024
Last updated:29 Nov 2025
6 days ago
Sadhugram Land Development & Site Preparation (Proposed)
Infrastructure Project
planning

Project Overview

This asset tracks the development progress of Sadhugram for Nashik’s 2026–28 Kumbh Mela. Tapovan has been publicly announced as the proposed site for Sadhugram development. Any updates to the location will be recorded here as officially communicated by the administration.

Upcoming Milestone

Actor Sayaji Shinde joins protest, supports citizens

Nashik East
🏢Nashik Municipal Corporation – Public Works Department (NMC PWD)

Recent Updates

Actor Sayaji Shinde joins protest, supports citizens
29 Nov 2025
Hundreds attend NMC public hearing at Pandit Paluskar Auditorium
24 Nov 2025
Last updated:29 Nov 2025
6 days ago
Tapovan Tree Replantation Program (Kumbh Mela 2026-27)
Afforestation
planning

Project Overview

A dedicated replantation program created to monitor the compensatory plantation promised during Kumbh Mela development. Tracks total trees removed, number of saplings planted, plantation sites, and survival rates.

Upcoming Milestone

NMC announces plan to plant 15,000 trees citywide

Nashik East
🏢Urban Development

Recent Updates

NMC announces plan to plant 15,000 trees citywide
planned
30 Nov 2025
Last updated:29 Nov 2025
6 days ago

Stalled Projects

2 projects facing delays

View All Stalled
Pune–Nashik Semi High-Speed Railway Corridor (235 km)
Transport Corridor
Stalled
⏱️ Stalled for: 3 years 5 months

Project Overview

The Pune–Nashik Semi-High-Speed Railway is a proposed intercity rail corridor aimed at enhancing regional connectivity and reducing travel time between the two major cities. The 235 km line was announced in 2020 with an estimated cost of around ₹16,000 crore. The project aims to support freight movement from MIDC regions, reduce highway congestion, and build an industrial growth corridor between Pune, Ahmednagar, and Nashik. Multiple clearances, including land acquisition approvals, were initiated between 2020 and 2022. However, the project has remained stalled since 2023 due to funding gaps, delays in central approvals, and a lack of progress on detailed land acquisition planning. The project remains listed under the Maharashtra Rail Infrastructure Development Corporation (MahaRail), with no recent activity or updated timelines.

Reason for Delay

This is a proposed corridor that has government backing and a completed DPR, but no construction work has begun. While the project has cost estimates and in-principle approval, key elements such as the final route, number of stations, land acquisition progress, and implementation timelines remain unresolved. No major updates have been recorded since 2023 from the implementing agency. Until there is firm movement such as land acquisition notifications, tender invitations, or financial sanction, the project remains classified as “Stalled.” For manageability within the platform, the project is currently listed under Nashik District, although it impacts multiple districts.

Budget₹16039.00 Cr
Zero utilization
₹16039.00 Cr allocated but not yet utilized
Nashik
🏢Ministry of Railways

Recent Updates

New alignment via Shirdi announced
revised
10 Feb 2024
Land acquisition begins
planned
14 Jul 2022
Announced: 4 Jun 2020
Last updated:2 Dec 2025
3 days ago
Nashik Metro Neo (BRT/METRO variant under evaluation)
Transport Corridor
Stalled
⏱️ Stalled for: 4 years 10 months

Project Overview

Nashik Metro Neo is a proposed rubber-tyred, elevated, metro-like transit system announced in the Union Budget 2021–22 with an initial outlay of ₹2,092 crore. The project received state approval, a completed DPR, and initial central allocation. However, no construction activity has taken place since 2022. Due to evolving ridership estimates, corridor redesign needs, and changes in urban mobility planning, the original Metro Neo plan is currently under reassessment. Public reports indicate that a revised MetroNeo/MetroLite/BRT hybrid model is now being evaluated as an alternative to the earlier design.

Reason for Delay

The Nashik Metro Neo project progressed through major approval steps between 2019 and 2021, including state approval, DPR submission, DPR approval, and a ₹2092 crore allocation in the Union Budget. However, since 2022, the project has seen no construction activity. Due to changing urban conditions, new ridership projections, and the need to re-evaluate the corridor design, the system has been placed under re-assessment. Recent reports suggest that a revised MetroNeo/MetroLite/BRT hybrid model is being considered to replace the original plan.

Budget₹2092.00 Cr
Zero utilization
₹2092.00 Cr allocated but not yet utilized
Nashik
🏢Urban Development

Recent Updates

Project stalled and under re-evaluation
stalled
1 May 2025
Nashik Metro Neo announced in Union Budget 2021–22
planned
1 Feb 2021
Announced: 1 Feb 2021
Last updated:14 Nov 2025
21 days ago